- Payment Options
- Terms Conditions
- Sattahip, Thailand
- info@boonchoo.org
**Objective:** To create a vibrant and accessible sports facility by constructing a Sports Playground and Futsal Field.
### Project Phases:
#### 1. **Project Initiation:**
– Define project scope, goals, and objectives.
– Identify stakeholders, including donors, community members, and local authorities.
– Establish a project team with key roles and responsibilities.
#### 2. **Feasibility Study:**
– Conduct a feasibility study for the selected vacant land.
– Assess environmental impact and obtain necessary permits.
– Analyze budget requirements and potential funding sources.
#### 3. **Site Preparation:**
– Engage a land surveyor to assess and mark the boundaries.
– Clear the site of any debris, rocks, or vegetation.
– Conduct soil testing to ensure a suitable base for construction.
#### 4. **Design and Planning:**
– Collaborate with a landscape architect and sports facility designer.
– Develop detailed architectural plans for the sports playground and futsal field.
– Create a 3D model or visual representation for donors to understand the project.
#### 5. **Donor Engagement:**
– Develop a comprehensive project plan document for donors.
– Highlight the benefits of the project for the community.
– Clearly outline the budget breakdown and funding needs.
– Create promotional materials, such as brochures and a website, to attract potential donors.
#### 6. **Fundraising:**
– Implement a fundraising campaign using online platforms, events, and community outreach.
– Explore partnerships with local businesses or sports organizations.
– Provide regular updates and progress reports to donors.
#### 7. **Construction Phase:**
– Hire a qualified construction team experienced in sports facility development.
– Begin with the preparation of the base, including excavation and grading.
– Install artificial grass, ensuring quality and durability.
– Implement lining for sports courts and install fencing around the facility.
#### 8. **Quality Assurance and Inspection:**
– Conduct regular inspections throughout the construction phase.
– Ensure that the construction meets safety and quality standards.
– Address any issues or concerns promptly.
#### 9. **Community Involvement:**
– Involve the local community in the project through volunteer opportunities or engagement events.
– Organize an opening ceremony to celebrate the completion of the sports playground and futsal field.
#### 10. **Post-Construction Maintenance and Monitoring:**
– Establish a maintenance plan for the sports facility.
– Monitor usage and address any maintenance needs promptly.
– Collect feedback from the community to continually improve the facility.
Nurturing Potential, Building Futures. Dedicated to providing a safe and inclusive haven for children with special needs, our mission is to empower every child with the tools they need to thrive.