LATEST All information available in the news
฿
Personal Info

Billing Details

To make an offline donation toward this cause, follow these steps:

Bank Transfer

Account Name: Boonchu Muangmaithong
Name of Bank: Krungthai Bank (KTB)
A/C No: 2321002409
(Confirm donation to our email  -  donations@boonchoo.org or call us on 089 809 5279

Bank and Personal Checks

Write a check payable to:
Boonchu Muangmaithong

  1. On the memo line of the check, indicate that the donation is for:
    "Teacher Boonchoo Home for Special Needs Children" 
  2. Mail your check to:
    Teacher Boonchoo Home for Special Needs Children
    117/1 Phlu Ta Luang
    Sattahip District, CHON BURI 20180

    Your tax-deductible donation is greatly appreciated!

Donation Total: 500.00฿

**Objective:**
Implement a sustainable 5kWh solar power system at the school orphanage, utilizing a Huawei inverter, upgrading the wiring throughout the site, and coordinating with local authorities for meter and power pole access. This project aims to provide a reliable and eco-friendly energy source, reducing operational costs and fostering a green environment for the orphanage.

**Project Timeline:**
*Duration: 12 weeks*

**Phase 1: Planning (Week 1-2)**
1. Conduct a site assessment to determine the optimal locations for solar panels and the inverter.
2. Collaborate with an energy consultant to finalize the design and specifications.
3. Develop a budget and project timeline.

**Phase 2: Procurement (Week 3-4)**
1. Source and purchase the 5kWh solar panel system and Huawei inverter.
2. Procure necessary electrical equipment for the wiring upgrade.
3. Obtain quotes from local contractors for the installation.

**Phase 3: Site Preparation (Week 5)**
1. Clear designated areas for solar panel installation.
2. Prepare the site for new wiring, ensuring compliance with safety standards.
3. Communicate with staff regarding temporary disruptions during installation.

**Phase 4: Installation (Week 6-8)**
1. Install solar panels, ensuring proper alignment and secure mounting.
2. Set up the Huawei inverter and connect it to the solar panels.
3. Upgrade the wiring throughout the site to accommodate the new solar system.

**Phase 5: Testing and Commissioning (Week 9-10)**
1. Conduct thorough testing of the entire solar power system.
2. Ensure all electrical connections are secure and functioning correctly.
3. Coordinate with the Huawei inverter’s technical support for any troubleshooting.

**Phase 6: Coordination with Local Authorities (Week 11)**
1. Engage with local authorities to obtain necessary permits for the solar installation.
2. Coordinate with utility companies for meter installation and power pole access.

**Phase 7: Training and Handover (Week 12)**
1. Provide training to staff on the use and maintenance of the solar system.
2. Complete documentation for the project, including manuals and warranties.
3. Hand over the fully functional solar power system to the school orphanage.

**Project Team:**
– Project Manager
– Solar Panel Installer Team
– Electricians
– Energy Consultant
– Administrative Support

**Budget:**
Allocate funds for solar panels, Huawei inverter, electrical equipment, labor, permits, and training.

**Risk Management:**
Identify potential risks such as weather delays, permit issues, and equipment malfunctions. Develop contingency plans to address these challenges promptly.

By adhering to this comprehensive project plan, the installation of the 5kWh solar system will contribute to the school orphanage’s sustainable energy goals, benefitting both the environment and the community.